View Single Post
Old 10-20-2010, 12:46 AM   #1 (permalink)
TheePsycho
Sadist
 
Join Date: Jun 2008
Location: Milwaukee

CCM Fan
Kilt Club
Custom work again

Just posting to see if you could do the last couple of things I need to complete this project, and you have had this project once already.

What I need done.

1. Cut down the pump rod on the ccm pump kit I have to fit.
2. Create a custom pump arm to fit for the electronic setup.
3. Trim a tiny piece of metal off of some aluminum eye covers.
4. Mill two small slots in a frame for eye wires to pass through.
5. Would like two slots milled on the left and right side of a stock class feed tube.
6. Last thing I would like is another sled and a bolt without o-rings but slotted for a detent.

Let me know if this is something you can take on anytime soon.
TheePsycho is offline   Reply With Quote