View Single Post
Old 01-06-2011, 02:48 AM   #151 (permalink)
ironchef97
.
 
ironchef97's Avatar
 
Join Date: Sep 2008
Location: SD

RTP Fan
I'm glad I didn't jump in on this when I was originally trying to collect all the lever action mechanisms on mcb. I offered to purchase the prototype, but I never follow through. He told me:
Quote:
Probably still looking at 6 months to a year for me to get finished, I'm working and going to school so not a lot of time to spend in shop.
and that was dated from the middle of March of 2010. Good luck guys.
ironchef97 is offline   Reply With Quote