Thread: Shop Talk!
View Single Post
Old 11-01-2013, 11:01 PM   #516 (permalink)
lexiones
MCB Member
 
lexiones's Avatar
 
Join Date: Jul 2006
Location: Lewistown, pa

Fan of EMR
Well If I'm going to make them I'm going to make a decent lot. Most of the time on these is in the setup. I'm expecting about a 15 min each runtime and 1.5-2 hr setup. I just did a run of 3 this time as I needed one for a current build. If I order some delrin I'd order enough to do 20-30 and just hold onto whatever doesn't sell.
__________________
MCB Feedback
lexiones is offline   Reply With Quote