| It's on it's way back to PPS for some love:
1. The leak will be repaired.
2. The lower tube will be cut for a 12 gram drop out.
3. The body will be drilled for a wire detent to be added.
4. The body and frame will be plated in Black Matte Powder Coat.
Last edited by sloonan; 05-08-2008 at 09:09 AM.
|